Product Model
Down Lead Clamp for Pole and Tower
Product Model
Down Lead Clamp for Pole and Tower
Fixes cables to splice and terminal poles/towers
Standard supply per installation
Corrosion-resistant galvanized steel body
Hot-dip galvanized clamp block
Ideal for tension towers
The down-lead clamp is used to fix the cable to splice pole/tower and termainal pole/tower in the down-lead to the closure.In gernal,each 1.5 meters is supplied with a set
It is used to fix cable to the tension tower.In gernal,Each tower is supplied with 2 sets
For corrosion resistanct u-shaped clamp body of galvanized steel,clamp block is made up of hot galvanized steel
Down Lead Clamp is designed to lead down cables on splicing and terminal pole/tower and to fix the arch section on the middle reinforcing pole/tower. Normally, a unit of Down Lead Clamp is needed 1.5meters, and it is also used in other fixing area.
Used to place surplus optical cables for connecting ADSS/OPGW optical cable overhead lines and connect them to the optical cable. The head box is used in conjunction with each joint box, usually equipped with a spare cable rack.
Downlead wire clamp assembly uses: under the guidance of fixture is mainly used for fixing the installation of ADSS and OPGW on the tower of the cable wire. Such as the cable bar joint (tower), cable from the clip to hardware leads to connection protection box is arranged at the fixed effect; cable from the tower lead to underground pipes, cable trench, buried, and lead to enter the engine room of the fixed. To avoid cable under the action of wind and tower or other objects of friction and damage of the cable, in order to protect the safety of the cable. We can provide the following models of the lead jig, respectively, are: the tower lead the jig and the pole type lead jig.
1)High mechanical strength performance
2)Hot dip galvanized surface treatment against rust and corrosion
3)Wide scope for different diameter pole mount
4)Easy mount around pole
Product Name | Model | Available Dia. of | Weight (kg) | Remark |
Rubber Down Lead Clamp for Pole | AN-DLC 1440-H | 9.0-14.4 | 0.85 | Usd For ADSS |
AN-DLC 1770-H | 14.5-17.7 | 0.85 | ||
Metal Down Lead Clamp for Pole | AN-DLC 240-H | 8.5-24.0 | 0.85 | Usd For OPGW |
Rubber own Lead Clamp for Tower | AN-DLC 1440-T | 9.0-14.4 | 0.95 | Usd For ADSS |
AN-DLC 1770-T | 14.5-17.7 | 0.95 | ||
Metal Down Lead Clamp for Tower | AN-DLC 240-T | 8.5-24.0 | 0.95 | Usd For OPGW |
1. For fiber optic cable connecting tower, tower cable lead terminal and the middle under the arched part of the tension cable tower fixed, each 1.5 meters with a set of general, other needs can also use a fixed place.
2. The down lead clamp is used in the immobility of OPGW/ADSS on pole/tower. It is suitable for the riveting of fiber when jumping or down lead. And it was commonly installed every 1.5 to 2 meter each set. This clamp bears the excellence of easy installation, wide adjustable range and suitable for different Dia.